61.6k views
2 votes
A machine can make 5 miles of ribbon in an hour. Graph the length of the ribbon the machine will make in eight hours. Another machine can make 8 miles of ribbon in an hour. Graph the length of the ribbon the machine will make in 8 hours. What is the difference in length for a 8 hour period between the two machines? Write an Equation in slope intercept for each machine.​

1 Answer

10 votes

Answer:

first machine make 40 miles in 8 hours

Explanation:

User RockWorld
by
4.8k points