Answer:
The correct answer is option B. $100 per inspection
Step-by-step explanation:
Let's start by clarifying what Activity-based costing is.
This activity is one of the methods used in an organization in which its objective is to assign a cost to the activities used for the production of goods and services.
If we analyze the information we have, we know that the expected overhead cost is $ 400,000. If we divide this number by the inspections that are 4000, we will obtain the price per per inspection:
400000/4000 = 100.
Given this information we can say that the correct answer is option B.