Answer:
a. $6
b. $3204000
Step-by-step explanation:
Given:
- Product X is 534,000 units
- cost for materials $1,441,800
- cost for labour: $1,762,200
(a) a standard cost
As we know standard cost is the cost of producing 1 unit and is recorded in a standard cost card. However, the cost of labor, materials and overhead are used to make a single unit, so
standard cost = unit variable cost = the total cost / the total number of unit.
In this situation, the overheading cost is not gven, so the total cost:
= The cost of labor + materials
= $1,441,800 + $1,762,200
= $3204000
=> standard cost = $3204000 / 534,000 = $6
(b) a budgeted cost represents the total costs
The total number of units * standard cost
= 534,000 * 6
= $3204000