228k views
2 votes
"A computer architect redesigns the pipeline above to enable branch prediction. When PCSrc is asserted (branch taken) IF/ID is flushed, and speculative instructions are flushed by deasserting some of their control signals. No other modifications are made. Which control signals of speculative instructions must be deasserted when PCSrc is asserted, to ensure correct operation

1 Answer

2 votes

Answer:

Step-by-step explanation:

Find attach the solution

"A computer architect redesigns the pipeline above to enable branch prediction-example-1
"A computer architect redesigns the pipeline above to enable branch prediction-example-2
User Tristantzara
by
5.7k points