Answer:
The predetermined overhead rate was 160%
Step-by-step explanation:
1. Because $120,000 of studio overhead was applied to Work in Process on the basis of $75,000 of direct staff costs, the predetermined overhead rate was 160%:
Studio overhead applied/Direct staff cost incurred= $120,000/$75000
= 160% rate