Answer:
Please kindly go through explanation for the answers.
Step-by-step explanation:
A)The required return if Beta is 2 = 0.06+0.08*2 =0.22
B)Here Rf = 0.06
Expected return of the portfolio = 0.4*22% + 0.6*6% =12.4%
since beta of Rf = 0,the expected beta = 0.4*2 = 0.8
C)Beta is nothing but systematic risk of a security in comparing to the market. In this case stock z having beta of 1.5 which is less than beta of stockX i.e 2. and expected return is 15%.so stockz is offering lower return at lower risk. If the investor is a risk averse its a good buy.
D) let W be portion of stock X.
Then w*2 + (1-w)*0 = 1.5
W = 1.5/2 =0.75
to construct a portfolio which has a beta of 1.5 we have to invest 75% of our money in stock X and remaining in risk free asset
E) expected return = 0.22*.75 +0.25*0.06 = 16.5% + 1.5% = 18%