Answer:
$35,300
Step-by-step explanation:
At the end of September total cost =
Material=$3,300
Labour=4800
Overheads(100% ×4800)=4800
Total=12,900
At the end of October total cost=
Material=3800
Labour=9300
Overheads(100% of 9300)=9300
Total=$22400
Total cost of the job at the end of October when it is completed
=$22,400$+$12,900
=$35,300
Therefore the total cost of the job when it is completed in October is $35,300