Pipe 1 works at a rate of (1 tank)/(44 min) = 1/44 tank/min.
Pipe 2 works at a rate of (1 tank)/(77 min) = 1/77 tank/min.
Together, both pipes work at a rate of (1/44 + 1/77) tank/min = 1/28 tank/min.
In this context, 1 tank = 7700 L. So when both pipes are working, water is flowing into the tank at a rate of
(1/28 tank/min) * (7700 L/tank) = 7700/28 L/min = 275 L/min
It then stands to reason that it would take 28 min for both pipes to fill the tank, since
(275 L/min) * (28 min) = 7700 L