Answer:
$1.236= Estimated manufacturing overhead rate
Step-by-step explanation:
Giving the following information:
Processing:
Direct labor cost= $44,500
Applied overhead= $55,000
To determine the estimated overhead rate, we need to use the following formula:
Allocated MOH= Estimated manufacturing overhead rate* Actual amount of allocation base
55,000= Estimated manufacturing overhead rate*44,500
55,000/44,500= Estimated manufacturing overhead rate
$1.236= Estimated manufacturing overhead rate