Answer:
The correct answer is option (D).
Step-by-step explanation:
According to the scenario, computation of the given data are as follows:
Rent (Fixed cost) = $1,000
Wages (variable cost )= $6,000
Fabric and thread (variable cost)= $1,500
Electricity (Fixed cost )= $500
So, we can calculate the total variable cost by using following formula:
Total variable cost = Wages + Fabric and thread cost
= $6,000 + $1,500
= $7,500