Answer:
Spending Variance $389 Unfavorable
Step-by-step explanation:
The spending variance is the difference between the standard cost allowed for the actual level of activity and the actual cost incurred.
$
Standard allowance ($19× 609) + 1090 12,661
Actual cost 13,050
Spending Variance 389 Unfavorable