Answer:
It would take 24.75 minutes for them to shove the driveway if they worked together.
Explanation:
The together rate is the sum of each separate rate.
In this problem:
Together rate: 1/x
Janet's rate: 1/55
Bill's rate: 1/45.
So
Together rate = Janet's rate + Bill's rate
We have to find x
![(1)/(x) = (1)/(55)+(1)/(45)](https://img.qammunity.org/2021/formulas/mathematics/college/yolmt5njsazdu13lsvj0442owcavci11aa.png)
The least common multiple between 55 and 45 is 495. So
![(1)/(x) = ((495)/(55) + (495)/(45))/(495)](https://img.qammunity.org/2021/formulas/mathematics/college/fial2cvowb4pd1fd2om2r40jf1zy19htlr.png)
![(1)/(x) = (9 + 11)/(495)](https://img.qammunity.org/2021/formulas/mathematics/college/yeohr8zvs3lmpwubganrqy76prm8mjyum7.png)
![(1)/(x) = (20)/(495)](https://img.qammunity.org/2021/formulas/mathematics/college/uojd1xnkdsmjgt6kny5js3s0sj8r8358j9.png)
![20x = 495](https://img.qammunity.org/2021/formulas/mathematics/college/853o1vgvla0ng96j5pnx8zix3ntjhh44qu.png)
![x = (495)/(20)](https://img.qammunity.org/2021/formulas/mathematics/college/gnvukeg2068g2xcci5gmq6iez8vqgpudtp.png)
![x = 24.75](https://img.qammunity.org/2021/formulas/mathematics/college/ujfxepddd1r8arcgt5g265pwmd3602yza0.png)
It would take 24.75 minutes for them to shove the driveway if they worked together.