Answer:
37.5N of effort is needed
Step-by-step explanation:
Assuming efficiency of the machine is 100%
Efficiency = Work done by the load/Work done by the effort × 100%
100% = Work done by the load/Work done by the effort × 100%
1 = Work done by the load/Work done by the effort
Cross multiplying,
Work done by effort = Work done by Load
Note that work done = Force × distance
Work done by load = Weight × resistance arm
= 200×1.5
= 300Nm... 1
Work done by effort = Effort × effort arm
= 8 × Effort... 2
Equating 1 and 2, we have;
300 = 8×Effort
Effort = 300/8
Effort = 37.5N