Brawdy Plastics, Inc., produces plastic seat belt retainers for General Motors at the Brawdy Plastics plant in Buffalo, New York. After final assembly and painting, the parts are placed on a conveyor belt that moves the parts past a final inspection station. How fast the parts move past the final inspection station depends upon the line speed of the conveyor belt (feet per minute). Although faster line speeds are desirable, management is concerned that increasing the line speed too much may not provide enough time for inspectors to identify which parts are actually defective. To test this theory, Brawdy Plastics conducted an experiment in which the same batch of parts, with a known number of defective parts, was inspected using a variety of line speeds.

The following data were collected. If required, enter negative values as negative numbers.
Line Speed Devective number
20 23
20 21
30 19
30 16
40 15
40 17
50 14
50 11

a. Select a scatter diagram with the line speed as the independent variable.b. What does the scatter diagram developed in part (a) indicate about the relationship between the two variables?

1 Answer

1 vote

Answer:

Here's what I get

Explanation:

(a) Scatter diagram

The scatter diagram is the figure below.

(b) Interpretation

The scatter diagram shows there is a linear relationship between the variables.

The defective number decreases as the line speed increases.

The inspectors miss more faulty parts when the line speed increases, so they report fewer of them.