Answer:
Total standard cost per unit is $41.98
Step-by-step explanation:
Computation of Stefani’s total standard cost per unit.
Direct materials ((3.40 pounds+0.60 pounds)×($ 5×96%)) = 19.20
Freight Cost ($ 0.40×(3.40 pounds+0.60 pounds)) = 1.60
Direct labor (1.00×($ 10.00+$ 3.90)) = 13.90
Setup, cleanup, and downtime (0.20×($ 10.00+$ 3.90)) = 2.78
Manufacturing overhead ($ 4.50×1.00) = 4.50
Total standard cost per unit = 41.98