149k views
2 votes
A. A cost object is a resource sacrificed or forgone to achieve a specific objective. Examples include direct​ materials, direct​ labor, and advertising. B. A cost object is a cost incurred​ (historical or past​ cost), as distinguished from a budgeted​ cost, which is a predicted or forecasted cost​ (a future​ cost). Examples include​ materials, labor, and overhead. C. A cost object is anything for which a separate measurement of costs is desired. Examples include a​ product, a​ service, and a customer. D. None of the above.

User Mattweyant
by
5.2k points

1 Answer

5 votes

Answer:

C. A cost object is anything for which a separate measurement of costs is desired. Examples include a​ product, a​ service, and a customer.

Step-by-step explanation:

The objective of the cost is to assigned the cost or to brief something that could be in terms of direct material cost, direct labor cost, manufacturing overhead cost, etc

Moreover it also have a distinct measurement which includes like product, service, customer as each one has separate measurement but they are linked to each other

Hence, the correct option is c.

User OMR
by
4.5k points