Answer:
Total Manufacturing Overheads = $1198,333
Step-by-step explanation:
Machine Supplies would vary with the new level of machine hours. therefore flex the overheads to obtain the budgeted manufacturing overheads.
Note ; Depreciation remains constant as this is not affected by new level of machine hours
Total manufacturing overhead costs at a level of 60000 machine hours
Indirect labor (780,000 /50,000×60,000) 650,000
Machine supplies ($250000/50,000×60,000) 208,333
Indirect materials (180,000/50,000×60,000) 150,000
Depreciation on factory building 190,000
Total Manufacturing Overheads 1198,333