Answer:
119 fans
Step-by-step explanation:
The computation of the estimated WIP is shown below:
= Average fans per hour × average hours
where,
Average fans per hour is
= 850 fans ÷ 20 hours
= 42.5 fans
And, the average hours is 2.8
So, the estimated WIP is
= 42.5 × 2.8
= 119 fans
We assume we have to find out the average estimated WIP level