Answer:
If the pool is 2/3 filled and then the inlet pipe and drain pipe are opened, it will take 140 hours to fill the pool
Explanation:
An inlet pipe can fill the pool in hours = 20
Inlet pipe 1 hour work =

A drain pipe can empty the pool in 21 hours
Drain pipe 1 hour work =

Inlet pipe and drain pipe 1 hour together work =

Now we are given that the pool is 2/3 filled
So, remaining portion to be filled =

So, Inlet pipe and drain pipe fill
in hours = 1
So, they can fill 1/3 in hours =

Hence If the pool is 2/3 filled and then the inlet pipe and drain pipe are opened, it will take 140 hours to fill the pool