Answer:
a. 0.208
b. 0.189
c. Not Hired
Step-by-step explanation:
Data provided in the question
Given that
Defective average = 0.02
Current Production rate = 53 per hour
Cost of inspector = 10 per hour
Now by considering the above information, the calculation is shown below
a. The inspection cost per unit in case of inspector is hired
= Cost of Inspector ÷ Production rate
= 11 ÷ 53
= 0.208
b. The defective cost per unit in case of an inspector is not hired is
= Cost of defective unit ÷ Production rate
= 10 ÷ 53
= 0.189
c. Since as we can see that the defective cost per unit is low if we compared with the inspection cost per unit so in this case the inspector should not be hired