Answer:
a) Average demand during the lead time = Sum of all the historical demand during lead time / Number of periods
= (55+75+75+70+80+60+50+70+60+85) / 10
= 680 / 10
= 68 gallons
b) Standard deviation of demand during lead time(\sigmadL) = 8.5 gallons
At 95% service level,value of Z = 1.65
Safety stock = Z(\sigmadL) = 1.65(8.5) = 14.03 gallons
c) Reorder point = Average demand during the lead time + Safety stock
= 68 + 14.03
= 82.03 gallons