193k views
2 votes
When was the mexican railway completed

2 Answers

6 votes
Incorporated in Colorado in 1880 as the Mexican National Railway (Ferrocarril Nacional Mexicano), and headed by General William Jackson Palmer of the Denver and Rio Grande Railway, it completed a 3 ft (914 mm) narrow gauge main line from Mexico City to Nuevo Laredo in September 1888
User Meirion
by
6.6k points
6 votes

Answer:

it completed a 3 ft (914 mm) narrow gauge main line from Mexico City to Nuevo Laredo in September 1888.

Step-by-step explanation:

User BillyTom
by
7.4k points