Answer:
Explanation:
Answer:
Explanation:
Given that,
Length of chain
L = 3m
Linear mass density is
ρ(x) = 2x(4 — x) kg/m lies on the ground
When x = 0, is top of the chain
Work done to lift the chain from top end so that the bottom is 2m above the ground.
Considered the segment of the chain of length ∆x that will be lifted in the positive y direction (+j)m from the foot.
The work needed to lift this segment is given as
Work = mass density × ∆x × gravity
W = ρ × ∆x × g
g is acting downward = 9.8j
Summing over all segment of the chain and passing to the limit as ∆x→0.
Therefore, the total work done needed to full extend the chain is
W = ∫ ρ × ∆x × g x = 0 to 3
Since g is constant
∆x = xdx
Then,
W = g ∫ 2x(4—x)x dx. x= 0 to x = 3
W = 9.81 ∫ (8x² — 2x³)x dx
W = 9.81 ( 8x³/3 — 2x⁴/4)
W=9.81(8x³/3— ½x⁴) from x=0 to x=3
W = 9.81[8(3)³/3 — ½(3⁴)] — 0
W = 9.81 × (72 —40.5)
W = 9.81 × 31.5
Work done= 309.015 J
Lifting the entire chain requires to light the weight
Weight = ∫ρgdx
Weight = g ∫ρ dx. From x=0 to x=3
Weight = g ∫ 2x(4-x) dx
Weight = 9.81 ∫(8x-2x²)dx
Weight = 9.81 [ 8x²/2 - 2x³/3]
Weight = 9.81[4x²-⅔x³] x=0 to x=3
Weight = 9.81[4(3²) — ⅔(3³)]
Weight = 9.81(36—18)
Weight = 9.81 × 18
Weight = 176.58N
Now, this weight is lifted to a height of 2m, then using potential energy formula, we have
P.E = Work = mgh = Weight ×height
Work = W×h = 176.58 × 2
Work = 353.16 J
Then, total workdone is
W = 353.16 + 309.015
W = 662.18 J
The required Work done required to lift the chain from top so that it's bottom is 2m from the ground is 662.18J