Final answer:
The total cost for Job No. 432 at Pigot Corporation is calculated using predetermined departmental overhead rates applied to the actual direct labor costs. After applying the overhead rates of 300% and 50% for Departments M and A respectively to the respective labor costs of $8,000 and $12,000, the total cost is found to be $75,000, which does not match any of the provided options.
Step-by-step explanation:
The question relates to the calculation of the total cost for Job. No. 432 in Pigot Corporation using job costing. First, we need to calculate the departmental overhead rates. We do this by dividing the budgeted factory overhead by the budgeted direct labor costs for Department M and Department A respectively.
Department M overhead rate = $600,000 / $200,000 = 3.0 or 300%
Department A overhead rate = $400,000 / $800,000 = 0.5 or 50%
Now, we apply these overhead rates to the actual direct labor costs for Job No. 432:
Overhead for Department M = 300% of $8,000 = $24,000
Overhead for Department A = 50% of $12,000 = $6,000
Adding the overhead to the actual direct materials and direct labor costs gives us the total cost for Job No. 432:
Total Cost for Job No. 432 = Direct Materials + Direct Labor + Applied Overhead
Total Cost for Job No. 432 = $25,000 + $20,000 + $24,000 + $6,000 = $75,000
Therefore, the correct answer is none of the provided options (a, b, c, d).