Answer:
Arrival rate, λ = 4 per hour
Service rate = 1/service time = (1 / 9 minute) * 60 minutes per hour = 20/3 = 6.67 per hour
a) Average number of trucks in system, L = λ/(μ-λ) = 4 / (20/3-4) = 1.5 trucks
b) Average time spent in the system, W = L/λ = 1.5/4 = 0.375 = 0.38 hour
c) Total system cost per day = (2*18 + 75*1.5) *8 = $ 1188 per hour
d) New service rate, μ' = (1/7 minutes) *60 minutes per hour = 8.57 per hour
Average number of trucks in system, L = λ/(μ'-λ) = 4/ (60/7 - 4) = 0.875 = 0.88 trucks
e) Average time spent in the system, W = L/λ = 0.875/4 = 0.2187 = 0.22 hour
f) Total system cost per day = (2*18 + 90*0.88) *8 + 200 = $ 1121.6 = 1122 per day
g) Based on above cost analysis, we see that Total system cost per day is lesser in after the new equipment is installed. Therefore, it is worth to install the new equipment.
Step-by-step explanation: