Answer:
(1) 22%
(2) 56%
Step-by-step explanation:
Given that,
Direct labor = $536,000;
Direct materials = $211,000;
Factory overhead = $119,000
(1) Predetermined overhead rate as a percent of direct labor is simply calculated by dividing the factory overhead by its direct labor cost.
Predetermined overhead rate as a percent of direct labor:
= (Factory overhead ÷ Direct labor) × 100
= ($119,000 ÷ $536,000) × 100
= 0.22 × 100
= 22%
(2) Predetermined overhead rate as a percent of direct materials is simply calculated by dividing the factory overhead by its direct material cost.
Predetermined overhead rate as a percent of direct material:
= (Factory overhead ÷ Direct material) × 100
= ($119,000 ÷ $211,000) × 100
= 0.56 × 100
= 56%