21.5k views
2 votes
The program evaluation and review technique (PERT) is __________. a. a network-based technique in which there is a single time estimate for each activity b. a network-based technique in which there are multiple time estimates for each activity c. a graphical tool that shows the logical linkages between activities in a project d. a graphical tool used to show expected start and end times for project activities and to track actual progress against these time targets e. I DON'T KNOW YET

User Bramble
by
4.3k points

1 Answer

4 votes

Answer:

The correct answer to the following question is "Option b".

Step-by-step explanation:

PERT is a methodology that organizations follow to evaluate and reflect the behavior within a venture, as well as to demonstrate the flow of occurrences within a project. It is indeed a tool for evaluating it calculating the duration needed to complete a job within and without the timelines.

  • It acts as a strategic method for the study, description, and integration of occurrences also demonstrates the tasks and trade-offs within a project.
  • PERT's primary purpose or objective is to cut costs and time required to execute a project.
User Ponny
by
4.6k points