28.6k views
1 vote
An electrician completes 1/6 of a job in 2/3 hour. at this rate, how long does it take the electrician to complete the job?

PLEASE HELP!!!! IM GONNA GET IN TROUBLE

User Suman KC
by
3.5k points

2 Answers

9 votes

Answer:

4

Explanation:

  • 1/6 x 2/3
  • (flip 1/6 to 6/1 so its easier to calculate; they mean the same thing)
  • 6/1 x 2/3 = 12/3
  • 3 x 12 = 4

Hope this helps <3

try to stay out of trouble lol

User Eriklharper
by
3.2k points
11 votes

Answer:

4 hours.

Explanation:

2/3 * 6

= 12/3

= 4 hours.

User Leonardo Cruz
by
3.8k points