two ways of making a complex part are possible: (1) using the sophisticated machines and the more sophisticated laborers, who earn about $25 an hour ;or (2) several unsophisticated machines in sequence using unsophisticated labor, earning $10 an hour. How much faster does (1) need to be compared to (2) for (1) to be the better method

User Meggy
by
6.2k points

1 Answer

2 votes

Answer:

2.5 times faster

Explanation:

The cost per hour of method 1 is $25, while the cost per hour of method 2 is $10. In order for method 1 to be the better method, it must have a productivity, in units per dollar, that is equal or greater than the productivity of method 2:


A(units)/(hour) *(hour)/(\$25) \geq B(units)/(hour) *(hour)/(\$10)\\0.04A\geq 0.1B\\A \geq 2.5 B

The productivity A of method 1, in units per hour, must be 2.5 times greater than the productivity of method 2, which means that method 1 needs to be 2.5 times faster than method (2) to be the better method.

User Politinsa
by
6.6k points
Welcome to QAmmunity.org, where you can ask questions and receive answers from other members of our community.