Answer:
Estimated manufacturing overhead rate= $27.59 per machine-hour
Step-by-step explanation:
Giving the following information:
Estimated machine-hours 40,100
Estimated variable manufacturing overhead $ 6.56 per machine-hour
Estimated total fixed manufacturing overhead $ 843,303
To calculate the estimated manufacturing overhead rate we need to use the following formula:
Estimated manufacturing overhead rate= total estimated overhead costs for the period/ total amount of allocation base
Estimated manufacturing overhead rate= (843,303/40,100) + 6.56= $27.59 per machine-hour