Answer:
Step-by-step explanation:
A) The type of control chart that is best to monitor this process is C chart. Because here the number of defects on in a unit is given an we have to monitor the number of defects in the process
B) Number of weeks = 6
Sum of complaints = 7+7+5+7+4+19 = 49
Value of C-bar = Complaints per week = Sum of complaints / Number of weeks = 49/6 = 8.17
Using Z = 3,
UCL = C-bar + [3(Sqrt of C-bar)]
= 8.17 + [3(Sqrt of 8.17)]
= 8.17 + (3X2.86)
= 8.17 + 8.58
= 16.75
LCL = C-bar - [3(Sqrt of C-bar)]
= 8.17 - [3(Sqrt of 8.17)]
= 8.17 - (3X2.86)
= 8.17 - 8.58
= - 0.41 or 0 (as when the LCL is less than zero, it is considered as zero)
d) According to the control limits, this process has been out of control. Because the number of defects in week 6 is more than the Upper specification limit. When the number of defects go beyond the upper and lower specification limit the process is out of control and a process is within control if the number of defects falls within the lower and upper specification limit.