79.1k views
2 votes
1. (1 pt) Suppose you wish to run a program P with 37.5 x 109instructions on a 15 GHz machine with a CPI of 0.75. What is the expected CPU time to execute this program on this machine

User Nstehr
by
4.7k points

1 Answer

1 vote

Answer:

Expected CPU time: 1.875 seconds.

User Mike Henry
by
4.9k points