187k views
3 votes
Harriet has been assigned the task of setting up work teams for a complex software development project. Each team has different work requirements. Harriet must choose the best structure for each team, based on its specific requirements. (Refer to Case Scenario 1) Team A must operate very quickly to meet stringent deadilines The quality of the final project depends highly on Team A's output, so Team A must also work very accurately, Which of the following network structures should Harriet choose for this A) chain B) wheel C) grapevine D) all-channel All lof the following are ways to overcome problems encountered with performance evaluations EXCEPT a. focus on identifiable trails b use mutiple evaluators c provide emplorees with due procesa d. train evaluators FS F7

User Don Jewett
by
6.2k points

1 Answer

7 votes

Answer:

1. b) wheel

2. a) focus on identifiable trails

Step-by-step explanation:

1. Since Harriet must choose the best structure for each team, based on its specific requirements, and Team A must operate very quickly to meet stringent deadlines plus the fact that the quality of the final project depends highly on Team A's output, the network structures that Harriet should choose for this is wheel

A wheel network structure has a leader who controls activities of the entire team and passes instructions directly to each member of the team unlike the chain structure that takes a long time to move from top to bottom because information must follow a hierarchy of seniority which will mean that deadliness may not be met.

2. All lof the following are ways to overcome problems encountered with performance evaluations EXCEPT focus on identifiable trails

User Jpalumickas
by
5.3k points