Answer:
60/0.16 = 375 asbys/hr= Production rate
1.0 = yield
62.5%= Proportion Uptime
Step-by-step explanation:
Tp = 0.1 + 10(1.0)(0.005)(1.2) = 0.16 min/asby.
(Production time (Tp) = cycle time+ no. of stations x probability of jamming the station x defect rate x breakdown time)
Rp = 60/0.16 = 375 asbys/hr= Production rate (Rp = 60/Tp)
If defects always jam the affected station,
then m = 1.0
Pap = (1 - 0.005 + 1x0.005) = 1.0 = yield
E = 0.1/0.16 = 0.625 = 62.5%= Proportion Uptime (cycle time/production time)