224k views
1 vote
Consider a single factor APT. Portfolio A has a beta of 1.0 and an expected return of 16%. Portfolio B has a beta of 0.8 and an expected return of 12%. The risk-free rate of return is 6%. If you wanted to take advantage of an arbitrage opportunity, you should take a short position in portfolio __________ and a long position in portfolio _______.

User Dalvenjia
by
5.7k points

1 Answer

3 votes

Answer:

B, A

Step-by-step explanation:

A: 16% = 1.0F + 6%; F = 10%; B: 12% = 0.8F + 6%: F = 7.5%; thus, short B and take a long position in A.

User Vincent Rodomista
by
6.0k points