Luke is building a storage building and needs to have a slab of concrete poured. He knows the contractor charges an initial cost of $95 plus an additional $3.50 per square foot of concrete. Formulate a function that can be used to determine the cost, in dollars, to pour a concrete slab with an area of x square feet.