What was the role of master builder?

User Efemoney
by
3.6k points

1 Answer

0 votes

Answer:

Master builders were responsible for the design, survey, engineering, and management of the construction. In other words, the head builder would be the architect, engineer, and superintendent for each project, Master builder project delivery system and designer construction knowledge