51.4k views
5 votes
Maddy has been performing at a very high level at a firm, and so when two of her colleagues who are currently leading other development efforts get sick or leave the company, she is asked to step in and help manage these two other efforts. When Maddy sits down at the first meeting at which the first group is gathering, she hears them discussing the feasibility study in which they are currently engaged. She knows, then, in which phase of the systems development life cycle (SDLC) this team currently is. Which phase is it?a. ​Systems analysis

b. ​Systems design
c. ​Systems planningd. ​Systems implementation

1 Answer

3 votes

Answer:

The correct answer is C

Step-by-step explanation:

System planning is the kind of planning which is done or conduct through people who have faith in future and have a vision of the future adequate in order to from a basis for planning.

This system planning has 2 major outputs that embody the contribution, which are design concepts and proposals.

Under, this case, the system planning phase of the system development life cycle is used by the team presently.

User Sihat Afnan
by
4.5k points