Answer:
The correct answer is B.
Step-by-step explanation:
Giving the following information:
Direct materials= 33,000
Direct labor= 13,000
Manufacturing overhead= 23,000
The prime cost is the sum of total direct material and total direct labor. The conversion cost is the sum of direct labor and allocated overhead.
Prime cost= direct material + direct labor
Prime cost= 33,000 + 13,000= $46,000