Answer:
Concepts 2,620 per project change
Desings 3 per square feet
contructions 1,110 per month
The product design is product level
The desing is unit level
And the construction oversights is batch level
Step-by-step explanation:
We divide the cost pool over the total cost driver to determinate the rate.
Desing is unit level as it is related to labor hours required for the desings if the architecture projects.
While, project change is at product level that is,
Unit-level activities are performed for each unit of production. As this is Architecture desining is done on eahc project.
Batch-level activities are performed every time a company produces another batch of a product. The construction oversight is related to the duration of each project that is for each batch
Product-level activities are performed every time a company produces a new type of product. When changing the desing, we are facing a new product.