220k views
4 votes
One partner can paint the Edison Mansion 5 days. His competitor can do the job in 6 days. If they agreed to work together at the same time and didn't interfere with each other, how long would it take them if they work at their normal rate of speed?

User Oyarzun
by
4.8k points

2 Answers

5 votes
They can finish in 2.5 days
User Rounds
by
3.3k points
6 votes

Answer:

2.73 days, working together without interference

Explanation:

The following formulas are pertinent here: 1 job = (rate)(time) and

1 job

time = ---------------------

1 job / days

In this specific case, there are two rates: 1 job / 5 days and 1 job / 6 days.

The combined rate would be:

1 job 1 job 6 + 5

---------- + ------------ = --------------- = 11/30 job/day

5 days 6 days (6)(5)

and so we have:

1 job

time = ------------------------ = 30/11 days, or 2.73 days

(11/30)(job/day)

User Swayziak
by
4.7k points