Answer: $0.75
Explanation: predetermined overhead rate = estimated manufacturing overhead cost/total overhead cost
estimated manufacturing overhead cost (labor cost) = $ 150000
total overhead cost = $200000
⇒ predetermined overhead rate = 150000/200000 = $0.75