Answer:
Step-by-step explanation:
Particulars Steel Bars Titanium Bars
Units Per Batch 7000 3000
Hours Per Unit 1 1
Total Hours 7000 3000
Overhead rate on the basis of direct labor = Total Overhead / Total labor hours = 84,000/10,000 i.e 8.40
Overhead cost allocated to steel bars = 8.40*7000 = 58,800