Answer:
The time required to finish the work by both candy and Tim working together = 36.83 minute
Explanation:
Time taken by the candy to finish the work
= 85 min
Time taken by the Tim to finish the work
= 65 min
Thus the time taken by both to finish the work =
![(T_1 *\ T_2)/(T_1 + T_2)](https://img.qammunity.org/2021/formulas/mathematics/high-school/tfaejpko98vabtqweqhbbwc49ef56052fc.png)
Put the values of
and
we get ,
=
![(85 *\ 65)/(85 + 65)](https://img.qammunity.org/2021/formulas/mathematics/high-school/79fwubegx2jik4me3x3r81fwtfxnanmjcn.png)
=
![(221)/(6)](https://img.qammunity.org/2021/formulas/mathematics/high-school/509g03h0zm83xfd3v0xihde0fbjkxu4sbc.png)
= 36.83 minute
Thus the time required to finish the work by both candy and Tim working together = 36.83 minute