Answer:
3600 hours
Explanation:
let total life time of t four transistors T = X1 + X2 + X3 + X4 (where X1,X2,X3 and X4 are life time of individual transistors
mean of the length of time that four transistors will last =E(T)=E(X1 + X2 + X3 + X4)
=E(x1) + E(x2) + E(x3) + E(x4) =900+900+900+900 =3600
and standard deviation of total time =SD(T)=sqrt(Var(T)) = sqrt(Var(X1) + Var(x2) + Var(x3) + Var(x4))
where sqrt means the square root
=sqrt(302+302+302+302) =sqrt(3600) =60