Answer:
Material Cost variance = Standard cost - Actual cost
= 3000*5 - 16192
= 1192 A
Material Rate Variance = (S.R. - A.R.)A.Q
= (5 - 5.06)3200
= 192 A
Material usage variance = (S.Q. - A.Q.)S.R
= (3000 - 3200)5
= 1000 A
Working Notes:
Actual Output = 1500 units
Standard qty of Material for Actual Output = 1500*2
= 3000 pounds
Actual qty. used = 3200 pounds
Actual rate/pound = $16192/3200
= $5.06