Production runs can be scheduled in A. only one shift B. always two shifts C. one or two shifts D. up to three shifts 2. Hiring the Needed Complement will always eliminate

User Bach
by
5.5k points

1 Answer

3 votes

Option C

Production runs can be scheduled in one or two shifts

Step-by-step explanation:

A production run is several factors that are offered continuously by a production line. It is normal for a factory to create one kind of thing coveted levels of inventory are obtained. An assortment of related goods that are designed by employing a particular group of construction methods, means or circumstances.

Up to twice the production line's First Shift Capacity can be cataloged for all products. The production runs that pass the First Shift Capacity occur in unless Overtime and/or a Second Shift, depending on the Operator Complement.