Answer:
c. $5.1 per hour.
Step-by-step explanation:
Estimated Manufacturing overhead = $249,000
Estimated direct labour hours = 50,000
Predetermined overhead Rate = Estimated Manufacturing overhead / Estimate direct labor hours
Predetermined overhead Rate = $249,000 / 50,000
Predetermined overhead Rate = $4.98
The given is inconsistent with the options given in this question. A similar question is attached with this answer. The following answer is made according to the attached question. please find that.
Estimated Manufacturing overhead = $254,000
Estimated direct labour hours = 50,000
Predetermined overhead Rate = Estimated Manufacturing overhead / Estimate direct labor hours
Predetermined overhead Rate = $254,000 / 50,000
Predetermined overhead Rate = $5.08 = $5.1 per hour