Answer:
The best option in this scenario is a parallel test.
Step-by-step explanation:
Holly wants to make sure that everything is working correctly and she wants to do check it all at the same time and as fast as possible so she does not disrupt the functions of any area, the best way to do this is the parallel test, this is a technique of evaluation that tests different areas separately at the same time in a faster and more functional way.