23.1k views
2 votes
A cable is being replaced 15 meters beneath the surface of a body of water. The new cable must extend from a pole located 9 meters above the surface of the water. A contractor can bill $30 for each meter of cable replaced. What is the minimum cost of the replacement?

1 Answer

6 votes

Answer:

Explanation:

Total cable length = 15m + 9m = 24m

$30 per meter * 24m = $720

User Serge Populov
by
8.2k points

No related questions found

Welcome to QAmmunity.org, where you can ask questions and receive answers from other members of our community.

9.4m questions

12.2m answers

Categories